Language: English

BOM

The job packet, made virtual.

BOM (Bill of Materials) brings the job details together into one virtual packet that travels with every run: the parts, the quantities, and the machines it routes through. The floor and your production data share a single definition of what is being made, out of what, and where.

Job packet JOB-4821

Pallet wrap, 18 in clear

Order qty

4,800 ea

Line

Line 14

Due

Jun 30

Material Qty

LLDPE resin

Dowlex 2045G, natural

1,250

kg

Blue masterbatch

Ampacet 2271

18

kg

Fiber cores

3 in, 96 count

96

ea

Stretch wrap labels

Print run B

4,800

ea

Routing
Line 14 Line 15 Line 12

See it in action

The job packet, in the real app.

Materials priced per unit, the device and product they belong to, and the labor routing the job runs through, all in one place. Built from the BOM workspace on blue-dev production data.

BOM
The product BOM with materials, quantities, per-unit cost, and the job-packet routing steps. Click to enlarge.

Anatomy of the packet

What is inside a job packet.

A tight run definition the floor can scan quickly and the rest of the suite can use.

01 Job header

Job, customer, product, due date, line, and order quantity.

02 Bill of materials

Materials, components, packaging, part numbers, and descriptions.

03 Quantities and units

Planned amounts in the units the floor uses: kg, lb, ea, ft, cases.

04 Labor and routing

Operations, expected labor, standard hours, and the machines in sequence.

05 Job context

Notes, specs, changeover context, and the shared run definition.

Across the suite

What the suite does with BOM and routing data.

BOM is the foundation for live job guidance, material variance, labor routing, and analysis by job, line, shift, and operation. Multi-step and batch production tracking builds on the same packet.

Advisor

Ask practical questions about the job.

With BOM and labor-routing context, Advisor can answer the questions supervisors and operators ask during the run: what the job should consume, what it has used, and which route step is holding it back.

Advisor BOM and routing

What material does Job 10482 on Line 14 consume, and what has it cost so far?

Job 10482 is running 18 in clear pallet wrap on Line 14. The planned BOM calls for 1,250 kg Dowlex 2045G LLDPE, 18 kg Ampacet 2271 blue masterbatch, 96 fiber cores, and 4,800 labels. Actual material issued so far is 742 kg LLDPE and 10.9 kg masterbatch. At the current material rates, the run has consumed about $1,090 in resin, $95 in color, and $180 in cores and labels.

Which routing step is the bottleneck for this job?

The Line 15 slitting step is pacing behind standard. Line 14 extrusion finished 3.4% faster than standard, but Line 15 is running 11.8% over standard machine time with 42 minutes of knife-change downtime. Line 12 packaging is waiting on slit rolls, so I would start with the slitter setup loss.

What's the standard vs actual material usage for this run?

For Job 10482, standard usage through the current quantity is 721 kg LLDPE and 10.4 kg masterbatch. Actual is 742 kg LLDPE and 10.9 kg masterbatch. That puts LLDPE at 2.9% over standard and masterbatch at 4.8% over standard. Scrap is concentrated after the Line 7 print pass, mostly registration rejects on the first two rolls.

Ask about a job, material, route step, or standard versus actual usage

What it unlocks

A material layer the whole suite can build on.

With a shared job packet in place, material and routing context power the next layer of production workflows.

  • Show the active BOM beside the live job in Pulse
  • Guide operators through the current route step in Work Tracker
  • Compare standard material usage against actual consumption by run
  • Tie downtime, scrap, and OEE to the machine step where they happened
  • Flag route steps that are running over standard labor or machine time
  • Roll job, material, and route history into Explorer for analysis
  • Give Advisor the job context it needs to answer practical floor questions

Coming soon

Multi-step and batch production tracking.

One grouped roadmap item for lines with multiple machines per line, and for batch processes with sequential steps: step starts and ends, one flowing into the next. Distinct from today's loss analysis and waterfalls.

Coming soon

Track multi-machine lines and sequential batch steps against the same BOM packet, so upstream and downstream constraints share one run definition.

Give every job one source of truth.

Book a demo and we will show how the virtual job packet ties materials, jobs, and your production data together.