OEE IntelliSuite Packaging manufacturing case study

Flexible packaging · Vorne boards and Work Tracker · 11 lines and 4 manual stations · Plant-owned network

Four years from paper reports to managing by exception

A flexible packaging converter ran Vorne boards and Work Tracker together for four years. Paper logs and re-typing gave way to job, count and downtime data captured at the work center, synchronized with the ERP and visible live across the floor.

OperationFlexible packaging converter
Footprint11 connected lines and 4 manual stations
WorkforceAbout 18 production employees

Production is high mix with short runs and frequent changeovers. Work Tracker is where the record is made: operators run jobs and enter counts and reasons at the machine. The Vorne boards put that same picture up where everyone can see it, as it happens.

Results

+5.3 pts

Overall Equipment Effectiveness (OEE), 61.2% to 66.5%

-10%

Unplanned downtime rate, 15.4% to 13.8%

5.5 hr/wk

Shift-report preparation time eliminated

8.0 hr/wk

Data re-entry and spreadsheet reconciliation eliminated

Vorne boards and Work Tracker directly replaced several manual reporting steps. The OEE and downtime results reflect the broader operating system, including maintenance, training, planning, standard work and management follow-through, not software alone. Customer anonymized.

Before

  • Jobs lived in the ERP and floor activity lived on paper, as separate records.
  • Paper reached the system only when someone typed it in by hand, so counts and reports were always behind.
  • No one could see how production was running right now. A stop's reason and context arrived later, if at all.
  • The four manual stations sat outside the data flow, so their work never showed up alongside the lines.
OEE IntelliSuite · Packaging manufacturing case study Page 1 of 2
OEE IntelliSuite Packaging manufacturing case study

What changed on the floor

  1. One live view. The Vorne boards show the current job, machine state and counts against target, so anyone walking the floor can see how each line is running.
  2. Jobs, parts and counts tied to the run. Operators scan a job in at the machine, then start, change and end it. Counts, reject reasons and notes stay with it.
  3. Reasons while the stop is fresh. The operator taps a reason code on the tablet, with a fuller explanation for long stops. Missing reasons are flagged and fixed then, not at shift end.
  4. Manual stations included. The four manual stations record jobs, counts, rejects and downtime the same way as the connected lines.
  5. ERP in step, on the plant's network. Jobs and production data synchronize with the ERP without re-typing, on the plant's own network with no cloud required.

The path was not smooth

  1. Year 2, press breakdown. A multi-month repair and restart period pushed downtime back near the starting range.
  2. Year 3, product ramp. A new film-and-seal specification temporarily lifted rejects while process windows were revised.
  3. Reporting work plateau. Shift-report preparation fell quickly, but two to three hours a week remained because one customer's report format still required a manual export.

Four years, step by step

Year 1 Get reliable data at the machine

  • Brought 11 lines and four manual stations onto Work Tracker.
  • Put Vorne boards up so live status was visible across the floor.
  • Replaced handwritten shift summaries with capture at the machine, synchronized with the ERP.

Year 2 Tighten the data, retire the paper logs

  • Rationalized downtime and reject reasons.
  • Tightened follow-up on missing downtime reasons while stops were still fresh.
  • Stopped rebuilding shift reports from paper logs.

Year 3 Standardize how jobs run

  • Deployed job-start and job-end checklists.
  • Used reject reasons and notes for continuity between shifts.
  • Reviewed extended downtime explanations to target repeat losses.

Year 4 Manage by exception

  • Reviewed only the records that needed follow-up.
  • Used the Vorne boards and the same Work Tracker data in daily meetings.
  • Expanded standard work to recurring high-loss jobs.
OEE IntelliSuite · Packaging manufacturing case study Page 2 of 2