A food manufacturer put Vorne boards on its packaging machines a few at a time, fixed the targets until operators believed them, and got supervisors watching the numbers during the shift. OEE went from 35.8% to 47.2% in six years.
Results, 2019 to 2025
+11.4 pts
Plant OEE, 35.8% to 47.2%
+5.0 pts
Availability, 66.3% to 71.3%
+8.5 pts
OEE on the 28 machines that ran in both years, 35.6% to 44.2%
How they got there
Step 1 Start small
- One machine first, then a few lines, then most of the plant.
- Counts and run time collected automatically, on the plant's own network.
Step 2 Put the numbers on the floor
- A Vorne board at each machine shows count, rate and target as the job runs.
- Operators scan the job and enter a reason when the machine stops.
Step 3 Fix the targets
- From 2020 to 2022 the plant reworked cycle time targets on hundreds of machine and part combinations.
- A target nobody believes gets ignored. One that looks right gets chased.
Step 4 Watch it and act on it
- Supervisors follow the shift live and get alerts instead of a report the next day.
- Managers look back over months and years to see what is actually improving.