OEE IntelliSuite Food manufacturing case study

Food manufacturing · Vorne boards · Pulse and Explorer

Start small, get the floor to trust the numbers, and OEE follows

A food manufacturer put Vorne boards on its packaging machines a few at a time, fixed the targets until operators believed them, and got supervisors watching the numbers during the shift. OEE went from 35.8% to 47.2% in six years.

OperationFood manufacturer, packaging lines
FootprintAbout 50 machines with Vorne boards
SoftwarePulse on the floor, Explorer for history

Results, 2019 to 2025

+11.4 pts

Plant OEE, 35.8% to 47.2%

+5.0 pts

Availability, 66.3% to 71.3%

+8.5 pts

OEE on the 28 machines that ran in both years, 35.6% to 44.2%

How they got there

Step 1 Start small

  • One machine first, then a few lines, then most of the plant.
  • Counts and run time collected automatically, on the plant's own network.

Step 2 Put the numbers on the floor

  • A Vorne board at each machine shows count, rate and target as the job runs.
  • Operators scan the job and enter a reason when the machine stops.

Step 3 Fix the targets

  • From 2020 to 2022 the plant reworked cycle time targets on hundreds of machine and part combinations.
  • A target nobody believes gets ignored. One that looks right gets chased.

Step 4 Watch it and act on it

  • Supervisors follow the shift live and get alerts instead of a report the next day.
  • Managers look back over months and years to see what is actually improving.
OEE IntelliSuite · Food manufacturing case study Page 1 of 2
OEE IntelliSuite Food manufacturing case study

What the data shows

OEE sat flat through 2019 and 2020, at 35.8% and 35.2%. Then it rose every year: 39.8%, 42.7%, 43.6%, 46.4% and 47.2%.

The clearest gain is uptime. Machines ran 71.3% of their scheduled time in 2025, up from 66.3%. The rest came as the targets were brought in line with what each machine and part can really run, which is what made the number on the board worth chasing.

It is not just newer equipment. The 28 machines that ran in both 2019 and 2025 went from 35.6% to 44.2% on their own.

Where Pulse and Explorer fit

Pulse is the live view. A supervisor opens it to see what every machine is doing now, what the shift has made, how much of the job is left and when Pulse predicts it will finish.

Explorer is the history view. Managers use it to chart production over weeks and years. Both read the same record the boards write, so the number on the floor and the number in the meeting match.

What carries over to other plants

  1. Start small. A few machines collecting real data beat a plant-wide plan that never starts.
  2. Get the floor using it. Boards where operators can see them, jobs scanned, a reason entered for every stop.
  3. Tune the targets. Adjust cycle times until the target looks right to the people running the machine. That is when they start to care about it.
  4. Then act on it. Once supervisors watch the numbers and people care about them, the floor changes how it runs: fewer stops, fewer rejects, better rates. That is what raises OEE, and OEE is what reaches the bottom line.
OEE IntelliSuite · Food manufacturing case study Page 2 of 2